P8120001.JPG


Masaya Ishino of ICEPP

P8120003.JPG


Gas exhausted bubblers

P8120004.JPG


How to fix the TGCs on top

P8120005.JPG


How to fix the TGCs on top (side view)

P8120006.JPG


How to fix the TGCs

P8120007.JPG


Gas rack (top)

P8120008.JPG


Gas rack (middle)

P8120009.JPG


Gas rack (bottom)

P8120010.JPG


Gas mixing controller

P8120011.JPG


Gas rack (top and front)

P8120012.JPG


Gas rack (middle and front)

P8120013.JPG


Mier, Boris and Uradimile (the gas specialist)

P8140014.JPG


TGCs in the safety zone from outside

P8140015.JPG


TGCs in the safety zone (side view)

P8140016.JPG


Gas exhaust bubllers

P8140017.JPG


test NIM-bin from behind

P8140018.JPG


TGC in the safety zone

P8140019.JPG


test NIM-bin from front

P8140020.JPG


Oscillation in the oscilloscope!

P8140021.JPG


beam chamber behind the shield

P8140022.JPG


beam chamber (DWC) behind the shield

P8140024.JPG


beam chamber read cables

P8140025.JPG


beam chamber (DWC) behind the Fe-shield

P8140026.JPG


GIF area from outside

ŽŸ